Priserne på dine produkter kan du få vist efter Login.

Rebar w 0.73m l 2.57m h 6.3m IG w. stair

Rebar w 0.73m l 2.57m h 6.3m IG w. stair

Art.-nr. 680021000

Create anchoring-free, crane-adjustable working levels

Reinforcement scaffolding is primarily used for reinforcement work, for operating wall formwork, or for concreting. Up to a standing height of 4.50 m, the working scaffold is stable even without additional pressure support against a wall or formwork. This allows for uninterrupted work on the reinforcement.

The multi-trip packaging will be calculated at a later stage and added to the order confirmation
Flere oplysninger
Nyt materiel
Tilstand. Nyt materiel

Sættet består af følgende artikler

Flere oplysninger

Produktinformation

Create anchoring-free, crane-adjustable working levels

Reinforcement scaffolding is primarily used for reinforcement work, for operating wall formwork, or for concreting. Up to a standing height of 4.50 m, the working scaffold is stable even without additional pressure support against a wall or formwork. This allows for uninterrupted work on the reinforcement.

The multi-trip packaging will be calculated at a later stage and added to the order confirmation

Thanks to its high basic rigidity and tensile connections, the scaffolding can be moved quickly and easily with a crane and is thus quickly available at the next place of use. Depending on requirements, a scaffold width of 0.73 m or 1.09 m can be selected, for example, to store reinforcement on the scaffold.

For convenient access, it is possible to integrate stairs as an option.

Tekniske informationer

Vægt / stk. 944.63 kg
Emballagemængde 1 pc.

Kan anvendes i følgende systemer