Trench bridge w 1.09m l 5.14m h 1m

Trench bridge w 1.09m l 5.14m h 1m

Réf. 680048000

Ringlock trench bridges allow safe passage over hazardous areas on traffic routes, such as construction pits, watercourses or trenches. Ringlock can be flexibly adapted in width and length to the respective project requirements. In combination with construction stair towers, even greater differences in height can be safely overcome. Multi-span trench bridges are securely assembled on the ground in advance and then lifted into place by crane.

For larger spans (> 9.21 m) or extreme loads (> load class 3), temporary bridges from the Ringlock modular system offer the optimal solution.

The multi-trip packaging will be calculated at a later stage and added to the order confirmation
Plus d'informations
Matériel neuf
État : Matériel neuf

Le paquet comprend les produits suivants

  • Embase Réf. 301270000 Embase 4 pcs.
  • Vérin de pied 60cm Réf. 306010600 Vérin de pied 60cm 6 pcs.
  • Support de sécurité pour levage SW22 EU Réf. 306110004 Support de sécurité pour levage SW22 EU 4 pcs.
  • Montant 1,00m avec manchon Réf. 301011000 Montant 1,00m avec manchon 4 pcs.
  • Montant 2,50m avec manchon Réf. 301012500 Montant 2,50m avec manchon 2 pcs.
  • Moise 1,09m Réf. 301031095 Moise 1,09m 4 pcs.
  • Moise 2,57m Réf. 301032575 Moise 2,57m 12 pcs.
  • Diagonale verticale 200/257cm Réf. 301062575 Diagonale verticale 200/257cm 4 pcs.
  • Planchon acier 32/257cm Réf. 308032575 Planchon acier 32/257cm 6 pcs.
  • Plinthe acier jaune 2,57m Réf. 308402575 Plinthe acier jaune 2,57m 4 pcs.

Autres informations

Informations du produit

Ringlock trench bridges allow safe passage over hazardous areas on traffic routes, such as construction pits, watercourses or trenches. Ringlock can be flexibly adapted in width and length to the respective project requirements. In combination with construction stair towers, even greater differences in height can be safely overcome. Multi-span trench bridges are securely assembled on the ground in advance and then lifted into place by crane.

For larger spans (> 9.21 m) or extreme loads (> load class 3), temporary bridges from the Ringlock modular system offer the optimal solution.

The multi-trip packaging will be calculated at a later stage and added to the order confirmation

Informations techniques

Poids / pièce 409.72 kg
Unité d'emballage 1 pc.