Timber-beam floor formwork | Floor Formwork | Doka Latvia

You can view the prices of your products after login.

Timber-beam floor formwork

69 Products found
  • 1(current)
  • 2
  • 3
Formwork sheet 3S basic 21mm

The Formwork sheet 3S basic is a three-ply solid-wood sheet with urea-melamine resin coating on both sides for many different uses on construction sites.

Doka floor prop Eurex 20 top

Doka floor props Eurex 20 top are adjustable telescopic steel props that conform to EN 1065.
They are designed for use as vertical props for temporary structures.

Doka floor prop Eurex 30 top
Doka floor prop Eurex 20 eco
Removable folding tripod top

Art.-No. 586155500

Removable folding tripod 1.20m

Art.-No. 586145000

Lowering head H20

Art.-No. 586174000

Doka beam I tec 20
Doka beam H20 top P
Doka beam H20 eco N
Doka beam H20 eco P
Doka formwork sheet 3-SO 21mm

Hinweis zu Lieferkosten: Bei der Bestellung von ganzen Lkw-Ladungen erfolgt die Lieferung kostenlos ab Werk.

Handrail clamp S

Art.-No. 580470000

Handrail post 1.10m

Art.-No. 584384000

Attachable sleeve 24mm

Art.-No. 584385000

Screw sleeve 20.0

Art.-No. 584386000

Beam forming support 20

Art.-No. 586148000

4-way head H20

Art.-No. 586170000

Supporting head H20 DF

Art.-No. 586179000

Alu beam fork H20

Art.-No. 586182000

69 Products found
  • 1(current)
  • 2
  • 3