Create anchoring-free, crane-adjustable working levels

Reinforcement scaffolding is primarily used for reinforcement work, for operating wall formwork, or for concreting. Up to a standing height of 4.50 m, the working scaffold is stable even without additional pressure support against a wall or formwork. This allows for uninterrupted work on the reinforcement.

The multi-trip packaging will be calculated at a later stage and added to the order confirmation
More information
New Material
Condition: New Material

The package consists of the following products

  • Starter base collar Item no. 301270000 Starter base collar 12 pcs.
  • Base jack 60cm Item no. 306010600 Base jack 60cm 12 pcs.
  • Jack retainer for lifting SW22 EU Item no. 306110004 Jack retainer for lifting SW22 EU 8 pcs.
  • Base jack handle Item no. 397320000 Base jack handle 4 pcs.
  • Søjle 1,00m med horn Item no. 301011000 Standard 1.00m crimped spigot 8 stk.
  • Søjle 2,00m med horn Item no. 301012000 Søjle 2,00m med horn 24 stk.
  • Ledger 2'-5"" Item no. 301030735 Ledger 2'-5"" 20 pcs.
  • Ledger 8'-6"" Item no. 301032575 Ledger 8'-6"" 39 pcs.
  • Guardrail IG 2.57m Item no. 301892575 Guardrail IG 2.57m 24 pcs.
  • End guardrail IG 2'-5"" Item no. 301880735 End guardrail IG 2'-5"" 6 pcs.
  • Bay brace 6'-6""/2'-5"" Item no. 301060735 Bay brace 6'-6""/2'-5"" 4 pcs.
  • Bay brace 6'-6""/8'-6"" Item no. 301062575 Bay brace 6'-6""/8'-6"" 5 pcs.
  • Steel plank 1'-1""/8'-5"" Item no. 308032575 Steel plank 1'-1""/8'-5"" 18 pcs.
  • Alum. ladder hatch deck 8'-5"" Item no. 319022575 Alum. ladder hatch deck 8'-5"" 3 pcs.
  • Steel toeboard yellow 2'-5"" Item no. 308400735 Steel toeboard yellow 2'-5"" 6 pcs.
  • Steel toeboard yellow 8'-6"" Item no. 308402575 Steel toeboard yellow 8'-6"" 9 pcs.
  • Scaffold tube 48.3mm 1.50m Item no. 682015000 Scaffold tube 48.3mm 1.50m 4 pcs.
  • Normal coupler 48mm Item no. 682004000 Normal coupler 48mm 8 pcs.
  • Modul tube cap D48mm Item no. 693769001 Modul tube cap D48mm 4 pcs.
  • Spring pin EU Item no. 335150024 Spring pin EU 24 pcs.

Additional information

Product details

Create anchoring-free, crane-adjustable working levels

Reinforcement scaffolding is primarily used for reinforcement work, for operating wall formwork, or for concreting. Up to a standing height of 4.50 m, the working scaffold is stable even without additional pressure support against a wall or formwork. This allows for uninterrupted work on the reinforcement.

The multi-trip packaging will be calculated at a later stage and added to the order confirmation

Thanks to its high basic rigidity and tensile connections, the scaffolding can be moved quickly and easily with a crane and is thus quickly available at the next place of use. Depending on requirements, a scaffold width of 0.73 m or 1.09 m can be selected, for example, to store reinforcement on the scaffold.

For convenient access, it is possible to integrate stairs as an option.

Technical details

Weight / piece 1,653.08 kg
Packaged quantity 1 pc.

Can be applied in the following systems