| Weight / piece | 1,455.93 kg |
|---|---|
| Packaged quantity | 1 pc. |
- Login
-
Contact
-
Do you have any questions about the Online Shop or do you need help? We are here for you: shop-ca@doka.com
Don’t forget to visit our FAQ as well.
- Contact Form
-
- EN
-
-
Australia
-
Austria
-
Belgium
-
Bulgaria
-
Chile
-
Croatia
-
Czech Republic
-
Denmark
-
Estonia
-
Finland
-
France
-
Germany
-
Greece
-
Hungary
-
Italy
-
Latvia
-
Lithuania
-
Luxembourg
-
Netherlands
-
Norway
-
Oman
-
Peru
-
Poland
-
Portugal
-
Qatar
-
Romania
-
Saudi Arabia
-
Serbia
-
Slovakia
-
Slovenia
-
Spain
-
Sweden
-
Switzerland
-
Turkey
-
Ukraine
-
United Arab Emirates
-
United Kingdom
-
United States
-
- Home
- Scaffolding
- Ringlock packages
- Reinforcement scaffolding
- Rebar w 0.73m l 7.71m h 4.3m IG w. stair
Additional information
Product details
Reinforcement scaffolding is primarily used for reinforcement work, for operating wall formwork, or for concreting. Up to a standing height of 4.50 m, the working scaffold is stable even without additional pressure support against a wall or formwork. This allows for uninterrupted work on the reinforcement.
Thanks to its high basic rigidity and tensile connections, the scaffolding can be moved quickly and easily with a crane and is thus quickly available at the next place of use. Depending on requirements, a scaffold width of 0.73 m or 1.09 m can be selected, for example, to store reinforcement on the scaffold.
For convenient access, it is possible to integrate stairs as an option.
Technical details
Can be applied in the following systems
You can find more information on the use of cookies and opt-out options in our privacy statement.
You can amend your cookie settings at any time using the cookie settings link in the page footer. Please refer to our extensive privacy statement for more information.