| Weight / pc. | 709.81 kg |
|---|---|
| Maximum stillage quantity | 1 pc. |
- Login
-
Contact
-
Do you have any questions about our online shop or do you need any help? Do not hesitate to contact us: Shop-Schweiz@doka.com
Please also have a look at our FAQ.
- Contact Form
-
- EN
-
-
Australia
-
Austria
-
Belgium
-
Bulgaria
-
Canada
-
Chile
-
Croatia
-
Czech Republic
-
Denmark
-
Estonia
-
Finland
-
France
-
Germany
-
Greece
-
Hungary
-
Italy
-
Latvia
-
Lithuania
-
Luxembourg
-
Netherlands
-
Norway
-
Oman
-
Peru
-
Poland
-
Portugal
-
Qatar
-
Romania
-
Saudi Arabia
-
Serbia
-
Slovakia
-
Slovenia
-
Spain
-
Sweden
-
Turkey
-
Ukraine
-
United Arab Emirates
-
United Kingdom
-
United States
-
-
Wall Formwork
Column formwork KS Xlife Column formwork Framax Xlife Column formwork Frami Xlife Column formwork Top 50 Column formwork RS Column formwork Alu-Framax Xlife
- Floor Formwork
-
Components & Accessories
Floor props Eurex eco Floor prop Eurex 20 LW Floor prop Eurex top Floor prop Eurex 60 Floor prop Eurex 100 plusPlumbing accessories Multi-trip packaging Shutters Fair-faced concrete Formtex Cleaning Concremote Accessories Alignment struts DokaRex Scaffold tubes and couplings Stacking cones
- Safety Products
- Scaffolding
- Shoring
How to upload your material list?
1st step: To upload an material list in the Online Shop you have to create a CSV file showing
- the article no. in column A and
- the quantity in column B (pc.)
- optional: business type in column C (1 = sale new, 2 = sale used, 3 = rent)
2nd step: Upload the CSV file
3rd step: Click the "upload material list" button
- Home
- Scaffolding
- Ringlock packages
- Reinforcement scaffolding
- Rebar w 0.73m l 5.14m h 2.3m IG w. stair
More Details
Product Information
Reinforcement scaffolding is primarily used for reinforcement work, for operating wall formwork, or for concreting. Up to a standing height of 4.50 m, the working scaffold is stable even without additional pressure support against a wall or formwork. This allows for uninterrupted work on the reinforcement.
Thanks to its high basic rigidity and tensile connections, the scaffolding can be moved quickly and easily with a crane and is thus quickly available at the next place of use. Depending on requirements, a scaffold width of 0.73 m or 1.09 m can be selected, for example, to store reinforcement on the scaffold.
For convenient access, it is possible to integrate stairs as an option.
Technical Information
Can be used with following systems
Consent for Cookies
You can find more information on the use of cookies and opt-out options in our privacy statement.
You can amend your cookie settings at any time using the cookie settings link in the page footer. Please refer to our extensive privacy statement for more information.