Scaffolding | Doka Switzerland

Vous pouvez afficher les prix de vos produits après vous être connecté(e) ou inscrit(e).

Scaffolding

141 produits trouvés
  • 6
  • 7(current)
  • 8
Trench bridge w 1.4m l 5.14m h 1m

Réf. 680054000

Ringlock trench bridges allow safe passage over hazardous areas on traffic routes, such as construction pits, watercourses or trenches. Ringlock can be flexibly adapted in width and length to the respective project requirements. In combination with construction stair towers, even greater differences in height can be safely overcome. Multi-span trench bridges are securely assembled on the ground in advance and then lifted into place by crane.

For larger spans (> 9.21 m) or extreme loads (> load class 3), temporary bridges from the Ringlock modular system offer the optimal solution.

Trench bridge w 1.09m l 6.14m h 1m

Réf. 680049000

Ringlock trench bridges allow safe passage over hazardous areas on traffic routes, such as construction pits, watercourses or trenches. Ringlock can be flexibly adapted in width and length to the respective project requirements. In combination with construction stair towers, even greater differences in height can be safely overcome. Multi-span trench bridges are securely assembled on the ground in advance and then lifted into place by crane.

For larger spans (> 9.21 m) or extreme loads (> load class 3), temporary bridges from the Ringlock modular system offer the optimal solution.

Trench bridge w 1.4m l 7.21m h 1m

Réf. 680056000

Ringlock trench bridges allow safe passage over hazardous areas on traffic routes, such as construction pits, watercourses or trenches. Ringlock can be flexibly adapted in width and length to the respective project requirements. In combination with construction stair towers, even greater differences in height can be safely overcome. Multi-span trench bridges are securely assembled on the ground in advance and then lifted into place by crane.

For larger spans (> 9.21 m) or extreme loads (> load class 3), temporary bridges from the Ringlock modular system offer the optimal solution.

Trench bridge w 1.09m l 5.14m h 1m

Réf. 680048000

Ringlock trench bridges allow safe passage over hazardous areas on traffic routes, such as construction pits, watercourses or trenches. Ringlock can be flexibly adapted in width and length to the respective project requirements. In combination with construction stair towers, even greater differences in height can be safely overcome. Multi-span trench bridges are securely assembled on the ground in advance and then lifted into place by crane.

For larger spans (> 9.21 m) or extreme loads (> load class 3), temporary bridges from the Ringlock modular system offer the optimal solution.

Trench bridge w 1.4m l 9.21m h 1m

Réf. 680058000

Ringlock trench bridges allow safe passage over hazardous areas on traffic routes, such as construction pits, watercourses or trenches. Ringlock can be flexibly adapted in width and length to the respective project requirements. In combination with construction stair towers, even greater differences in height can be safely overcome. Multi-span trench bridges are securely assembled on the ground in advance and then lifted into place by crane.

For larger spans (> 9.21 m) or extreme loads (> load class 3), temporary bridges from the Ringlock modular system offer the optimal solution.

Stair w 1.4m l 3.07m h 2.2m alternating

Réf. 680059000

The safe traffic route to all work levels.

Construction stair towers are the quickest and easiest way to access the various scaffold levels or working levels on the construction site. They provide safe access, even when carrying materials or tools.

The stair accesses can be integrated directly into the main scaffolding or erected as a separate 4-leg stair tower. If installed separately, the stair tower can be quickly moved using a crane. The aluminium platform stairs are available in two field heights: 1.00 m and 2.00 m.

Stair w 1.4m l 3.07m h 4.2m alternating

Réf. 680060000

Construction stair towers are the quickest and easiest way to access the various scaffold levels or working levels on the construction site. They provide safe access, even when carrying materials or tools.

The stair accesses can be integrated directly into the main scaffolding or erected as a separate 4-leg stair tower. If installed separately, the stair tower can be quickly moved using a crane. The aluminium platform stairs are available in two field heights: 1.00 m and 2.00 m.

Stair w 1.4m l 3.07m h 6.2m alternating

Réf. 680061000

Construction stair towers are the quickest and easiest way to access the various scaffold levels or working levels on the construction site. They provide safe access, even when carrying materials or tools.

The stair accesses can be integrated directly into the main scaffolding or erected as a separate 4-leg stair tower. If installed separately, the stair tower can be quickly moved using a crane. The aluminium platform stairs are available in two field heights: 1.00 m and 2.00 m.

Stair w 1.4m l 3.07m h 8.2m alternating

Réf. 680062000

Construction stair towers are the quickest and easiest way to access the various scaffold levels or working levels on the construction site. They provide safe access, even when carrying materials or tools.

The stair accesses can be integrated directly into the main scaffolding or erected as a separate 4-leg stair tower. If installed separately, the stair tower can be quickly moved using a crane. The aluminium platform stairs are available in two field heights: 1.00 m and 2.00 m.

Stair w 1.4m l 3.07m h 10.2m alternating

Réf. 680063000

Construction stair towers are the quickest and easiest way to access the various scaffold levels or working levels on the construction site. They provide safe access, even when carrying materials or tools.

The stair accesses can be integrated directly into the main scaffolding or erected as a separate 4-leg stair tower. If installed separately, the stair tower can be quickly moved using a crane. The aluminium platform stairs are available in two field heights: 1.00 m and 2.00 m.

Trench bridge w 1.4m l 6.14m h 1m

Réf. 680055000

Ringlock trench bridges allow safe passage over hazardous areas on traffic routes, such as construction pits, watercourses or trenches. Ringlock can be flexibly adapted in width and length to the respective project requirements. In combination with construction stair towers, even greater differences in height can be safely overcome. Multi-span trench bridges are securely assembled on the ground in advance and then lifted into place by crane.

For larger spans (> 9.21 m) or extreme loads (> load class 3), temporary bridges from the Ringlock modular system offer the optimal solution.

Stair w 1.4m l 2.57m h 10.2m alternating

Réf. 680041000

Construction stair towers are the quickest and easiest way to access the various scaffold levels or working levels on the construction site. They provide safe access, even when carrying materials or tools.

The stair accesses can be integrated directly into the main scaffolding or erected as a separate 4-leg stair tower. If installed separately, the stair tower can be quickly moved using a crane. The aluminium platform stairs are available in two field heights: 1.00 m and 2.00 m.

Rebar w 0.73m l 9.21m h 2.3m IG w. stair

Réf. 680034000

Reinforcement scaffolding is primarily used for reinforcement work, for operating wall formwork, or for concreting. Up to a standing height of 4.50 m, the working scaffold is stable even without additional pressure support against a wall or formwork. This allows for uninterrupted work on the reinforcement.

Thanks to its high basic rigidity and tensile connections, the scaffolding can be moved quickly and easily with a crane and is thus quickly available at the next place of use. Depending on requirements, a scaffold width of 0.73 m or 1.09 m can be selected, for example, to store reinforcement on the scaffold.

For convenient access, it is possible to integrate stairs as an option.

Rebar w 0.73m l 9.21m h 4.3m IG w. stair

Réf. 680035000

Reinforcement scaffolding is primarily used for reinforcement work, for operating wall formwork, or for concreting. Up to a standing height of 4.50 m, the working scaffold is stable even without additional pressure support against a wall or formwork. This allows for uninterrupted work on the reinforcement.

Thanks to its high basic rigidity and tensile connections, the scaffolding can be moved quickly and easily with a crane and is thus quickly available at the next place of use. Depending on requirements, a scaffold width of 0.73 m or 1.09 m can be selected, for example, to store reinforcement on the scaffold.

For convenient access, it is possible to integrate stairs as an option.

Stair w 1.4m l 2.57m h 2.2m alternating

Réf. 680037000

Construction stair towers are the quickest and easiest way to access the various scaffold levels or working levels on the construction site. They provide safe access, even when carrying materials or tools.

The stair accesses can be integrated directly into the main scaffolding or erected as a separate 4-leg stair tower. If installed separately, the stair tower can be quickly moved using a crane. The aluminium platform stairs are available in two field heights: 1.00 m and 2.00 m.

Stair w 1.4m l 2.57m h 4.2m alternating

Réf. 680038000

Construction stair towers are the quickest and easiest way to access the various scaffold levels or working levels on the construction site. They provide safe access, even when carrying materials or tools.

The stair accesses can be integrated directly into the main scaffolding or erected as a separate 4-leg stair tower. If installed separately, the stair tower can be quickly moved using a crane. The aluminium platform stairs are available in two field heights: 1.00 m and 2.00 m.

Trench bridge w 1.09m l 7.21m h 1m

Réf. 680050000

Ringlock trench bridges allow safe passage over hazardous areas on traffic routes, such as construction pits, watercourses or trenches. Ringlock can be flexibly adapted in width and length to the respective project requirements. In combination with construction stair towers, even greater differences in height can be safely overcome. Multi-span trench bridges are securely assembled on the ground in advance and then lifted into place by crane.

For larger spans (> 9.21 m) or extreme loads (> load class 3), temporary bridges from the Ringlock modular system offer the optimal solution.

Stair w 1.4m l 2.57m h 8.2m alternating

Réf. 680040000

Construction stair towers are the quickest and easiest way to access the various scaffold levels or working levels on the construction site. They provide safe access, even when carrying materials or tools.

The stair accesses can be integrated directly into the main scaffolding or erected as a separate 4-leg stair tower. If installed separately, the stair tower can be quickly moved using a crane. The aluminium platform stairs are available in two field heights: 1.00 m and 2.00 m.

Rebar w 0.73m l 9.21m h 6.2m IG w. stair

Réf. 680064000

Reinforcement scaffolding is primarily used for reinforcement work, for operating wall formwork, or for concreting. Up to a standing height of 4.50 m, the working scaffold is stable even without additional pressure support against a wall or formwork. This allows for uninterrupted work on the reinforcement.

Thanks to its high basic rigidity and tensile connections, the scaffolding can be moved quickly and easily with a crane and is thus quickly available at the next place of use. Depending on requirements, a scaffold width of 0.73 m or 1.09 m can be selected, for example, to store reinforcement on the scaffold.

For convenient access, it is possible to integrate stairs as an option.

Trench bridge w 1.09m l 4.14m h 1m

Réf. 680047000

Ringlock trench bridges allow safe passage over hazardous areas on traffic routes, such as construction pits, watercourses or trenches. Ringlock can be flexibly adapted in width and length to the respective project requirements. In combination with construction stair towers, even greater differences in height can be safely overcome. Multi-span trench bridges are securely assembled on the ground in advance and then lifted into place by crane.

For larger spans (> 9.21 m) or extreme loads (> load class 3), temporary bridges from the Ringlock modular system offer the optimal solution.

141 produits trouvés
  • 6
  • 7(current)
  • 8