You can view the prices of your products after login.

Rebar w 0.73m l 2.57m h 4.3m IG w. stair

Rebar w 0.73m l 2.57m h 4.3m IG w. stair

Art.-No. 680020000

Create anchoring-free, crane-adjustable working levels

Reinforcement scaffolding is primarily used for reinforcement work, for operating wall formwork, or for concreting. Up to a standing height of 4.50 m, the working scaffold is stable even without additional pressure support against a wall or formwork. This allows for uninterrupted work on the reinforcement.

The multi-trip packaging will be calculated at a later stage and added to the order confirmation
More Details
New Material
Condition: New Material

The package consists of the following products

  • Osnovni nastavek z rozeto Art.-No. 301270000 Starter base collar 6 kosi
  • Podstavek z dvižnim vijakom 60cm Art.-No. 306010600 Podstavek z dvižnim vijakom 60cm 6 kosi
  • Priključek 0,73m Art.-No. 301030735 Priključek 0,73m 20 kosi
  • Priključek 1,57m Art.-No. 301031575 Priključek 1,57m 2 kosi
  • Priključek 2,57m Art.-No. 301032575 Priključek 2,57m 9 kosi
  • Guardrail IG 2.57m Art.-No. 301892575 Guardrail IG 2.57m 8 kosi
  • End guardrail IG 0.73m Art.-No. 301880735 End guardrail IG 0.73m 4 kosi
  • Vertikalna diagonala 200/73cm Art.-No. 301060735 Vertikalna diagonala 200/73cm 2 kosi
  • Vertikalna diagonala 200/257cm Art.-No. 301062575 Vertikalna diagonala 200/257cm 2 kosi
  • Podnica 32/257cm Art.-No. 308032575 Podnica 32/257cm 6 kosi
  • Nožna zaščita rumena 0,73m Art.-No. 308400735 Nožna zaščita rumena 0,73m 7 kosi
  • Nožna zaščita rumena 1,57m Art.-No. 308401575 Nožna zaščita rumena 1,57m 1 kos
  • Stair outer guardrail 200/257cm Art.-No. 316062575 Stair outer guardrail 200/257cm 2 pcs.
  • Scaffold tube 48.3mm 1.50m Art.-No. 682015000 Scaffold tube 48.3mm 1.50m 2 pcs.
  • Normal coupler 48mm Art.-No. 682004000 Normal coupler 48mm 4 pcs.
  • Modul tube cap D48mm Art.-No. 693769001 Modul tube cap D48mm 2 pcs.
  • Spring pin EU Art.-No. 335150024 Spring pin EU 13 pcs.

More Details

Product Information

Create anchoring-free, crane-adjustable working levels

Reinforcement scaffolding is primarily used for reinforcement work, for operating wall formwork, or for concreting. Up to a standing height of 4.50 m, the working scaffold is stable even without additional pressure support against a wall or formwork. This allows for uninterrupted work on the reinforcement.

The multi-trip packaging will be calculated at a later stage and added to the order confirmation

Thanks to its high basic rigidity and tensile connections, the scaffolding can be moved quickly and easily with a crane and is thus quickly available at the next place of use. Depending on requirements, a scaffold width of 0.73 m or 1.09 m can be selected, for example, to store reinforcement on the scaffold.

For convenient access, it is possible to integrate stairs as an option.

Technical Information

Weight / pc. 520.32 kg
Maximum stillage quantity 1 pc.

Can be used with following systems