whitespace.png
Die Produktpreise werden nach dem Login angezeigt.

Rebar w 0.73m l 2.57m h 4.3m IG w. stair

Rebar w 0.73m l 2.57m h 4.3m IG w. stair

Art.-nr. 680020000

Create anchoring-free, crane-adjustable working levels

Reinforcement scaffolding is primarily used for reinforcement work, for operating wall formwork, or for concreting. Up to a standing height of 4.50 m, the working scaffold is stable even without additional pressure support against a wall or formwork. This allows for uninterrupted work on the reinforcement.

Mehr Informationen

Das Set besteht aus folgenden Artikeln

Weitere Informationen

Produktinformation

Create anchoring-free, crane-adjustable working levels

Reinforcement scaffolding is primarily used for reinforcement work, for operating wall formwork, or for concreting. Up to a standing height of 4.50 m, the working scaffold is stable even without additional pressure support against a wall or formwork. This allows for uninterrupted work on the reinforcement.

Technische Informationen

Gewicht / Stk. 520.32 kg
Verpackungsmenge 1 pc.