Rebar w 0.73m l 5.14m h 2.3m IG

Rebar w 0.73m l 5.14m h 2.3m IG

Art.-No. 680007000

Create anchoring-free, crane-adjustable working levels

Reinforcement scaffolding is primarily used for reinforcement work, for operating wall formwork, or for concreting. Up to a standing height of 4.50 m, the working scaffold is stable even without additional pressure support against a wall or formwork. This allows for uninterrupted work on the reinforcement.

The multi-trip packaging will be calculated at a later stage and added to the order confirmation
More Details
New Material
Condition: New Material

The package consists of the following products

  • Starter base collar Art.-No. 301270000 Starter base collar 9 pcs.
  • Screwjack 12"" Art.-No. 306010600 Screwjack 12"" 9 pcs.
  • Ledger 2'-5"" Art.-No. 301030735 Ledger 2'-5"" 9 pcs.
  • Ledger 8'-6"" Art.-No. 301032575 Ledger 8'-6"" 12 pcs.
  • Guardrail IG 2.57m Art.-No. 301892575 Guardrail IG 2.57m 6 pcs.
  • End guardrail IG 2'-5"" Art.-No. 301880735 End guardrail IG 2'-5"" 2 pcs.
  • Bay brace 6'-6""/2'-5"" Art.-No. 301060735 Bay brace 6'-6""/2'-5"" 3 pcs.
  • Bay brace 6'-6""/8'-6"" Art.-No. 301062575 Bay brace 6'-6""/8'-6"" 2 pcs.
  • Steel plank 1'-1""/8'-5"" Art.-No. 308032575 Steel plank 1'-1""/8'-5"" 6 pcs.
  • Alum. ladder hatch deck 8'-5"" Art.-No. 319022575 Alum. ladder hatch deck 8'-5"" 1 pc.
  • Steel toeboard yellow 2'-5"" Art.-No. 308400735 Steel toeboard yellow 2'-5"" 2 pcs.
  • Steel toeboard yellow 8'-6"" Art.-No. 308402575 Steel toeboard yellow 8'-6"" 2 pcs.
  • Scaffold tube 48.3mm 1.50m Art.-No. 682015000 Scaffold tube 48.3mm 1.50m 3 pcs.
  • Normal coupler 48mm Art.-No. 682004000 Normal coupler 48mm 6 pcs.
  • Modul tube cap D48mm Art.-No. 693769001 Modul tube cap D48mm 3 pcs.
  • Spring pin EU Art.-No. 335150024 Spring pin EU 6 pcs.

More Details

Product Information

Create anchoring-free, crane-adjustable working levels

Reinforcement scaffolding is primarily used for reinforcement work, for operating wall formwork, or for concreting. Up to a standing height of 4.50 m, the working scaffold is stable even without additional pressure support against a wall or formwork. This allows for uninterrupted work on the reinforcement.

The multi-trip packaging will be calculated at a later stage and added to the order confirmation

Thanks to its high basic rigidity and tensile connections, the scaffolding can be moved quickly and easily with a crane and is thus quickly available at the next place of use. Depending on requirements, a scaffold width of 0.73 m or 1.09 m can be selected, for example, to store reinforcement on the scaffold.

For convenient access, it is possible to integrate stairs as an option.

Technical Information

Weight / pc. 483.14 kg
Maximum stillage quantity 1 pc.