Moat bridge
▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁
d
h |
Service-Center
▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁▁
d
h |
With Ringlock as a trench bridge, dangerous points on traffic routes, e.g. construction pits, watercourses or trenches, can be passed safely. The width and length of Ringlock can be flexibly adapted to the respective project requirements. In combination with site stair towers, even large differences in height can be safely overcome. Multi-span trench bridges are safely assembled on the ground in advance and then lifted to the site by crane. For larger spans (> 9.21 m) or extreme loads (> load class 3), temporary bridges from the Ringlock modular system offer the optimum solution.
*Width: 1.09 m / 1.40 m
*Maximum length: 9.21 m
*Load class 3 according to EN 12811-1
*Customised configuration is possible for temporary bridges
If you have any further questions about scaffolding, we are at your disposal.
Phillip Schörmann
Head of Scaffolding
E-Mail: phillip.schoermann@doka.com
Phone: +49 160 975 832 03
You can find more information on the use of cookies and opt-out options in our privacy statement.
You can amend your cookie settings at any time using the cookie settings link in the page footer. Please refer to our extensive privacy statement for more information.